Jump to content

Caltrain

From Simple English Wikipedia, the free encyclopedia
Caltrain
Cal in black letters, with train inscribed within a red circle, all letters italicized
A red and white locomotive at a train station
Southbound train at Palo Alto in 2014
Overview
OwnerPeninsula Corridor Joint Powers Board
Area servedSanta Clara Valley
San Francisco Peninsula
Transit typeCommuter rail
Number of lines1
Number of stations31
Daily ridership
  • 65,095 weekdays
  • 13,954 Saturdays
  • 9,637 Sundays
  • (February 2018 AMWR)[1][2][3]
HeadquartersSan Carlos, California
Websitehttps://www.caltrain.com/main.html
Operation
Began operation1985 (as Caltrain)
1863 (as Peninsula Commute)
Operator(s)Southern Pacific (1870–1992)
Amtrak California (1992–2012)
TransitAmerica Services (2012–present)
Reporting marksJPBX
Infrastructure manager(s)Union Pacific (Tamien–Gilroy)
Charactercommuter railroad with level crossings; limited freight service
Number of vehicles29 locomotives and 134 passenger cars (in revenue service)[4]
Train length1 locomotive, 5 or 6 passenger cars
Technical
System length77.2 mi (124.2 km)
No. of tracks2+[5]
Track gauge4 ft 8 12 in (1,435 mm) standard gauge
Electrification25 kV 60 Hz AC overhead catenary[6] (2024)
Top speed79 mph (127 km/h)

Caltrain is a California commuter rail line. It serves the San Francisco Peninsula and Santa Clara Valley (Silicon Valley). The southern end of the line is in San Jose at Tamien station. Caltrain has 28 regular stops.[3][1]

References

[change | change source]
  1. 1.0 1.1 In 2018, as explained in the Annual Passenger Counts report on pages 1 & 2, Caltrain changed the counting methodology for weekdays. Prior to 2018, weekday counts were based on all weekday trains, counted once on each weekday (i.e., each train was counted from Monday to Friday of one week). In 2018, an "average mid-weekday ridership" count was computed by counting all weekday trains twice on two of three days in the middle of the week (i.e., each train was counted on Tuesday, Wednesday, and/or Thursday for two weeks). Because Monday and Friday ridership lags the mid-weekdays (for 2013-2017, Monday -1%; Friday -9%), the prior methodology of average weekday ridership gives a passenger count approximately 2% lower than the average mid-weekday ridership.
  2. "Ridership Reports". Caltrain. Retrieved 17 October 2018.
  3. 3.0 3.1 "Ridership Reports" (PDF). Caltrain. Archived from the original (PDF) on 20 May 2020. Retrieved 17 October 2018.
  4. "Caltrain-Commute Fleet". Caltrain.com. Retrieved September 27, 2017.
  5. Template:CA rail schematics
  6. "Stadler Awarded Contract for 16 Double-Decker Trains by Caltrain" (PDF). Archived from the original (PDF) on September 21, 2016. Retrieved August 23, 2016.